Colorado department of public health & Environment

clear creek water treatment facility

The site, developed by CDOT, is located within the historic district of Black Hawk. General building massing and two story height has been established to accommodate the needs of the process equipment.

To meet the design requirements of longevity, cost, energy consumption, state and local historical parameters, and overall aesthetics, appropriate building materials have been selected.

The architectural materials selected are comprised of anodized aluminum storefront, random ashlar pattern of sandstone, board-form exposed concrete site walls, Centria metal panels and aluminum shades.
 

 

Location: Black Hawk, CO

Square Footage - New: 12,000

Cost: $8,600,000